Mokama-Munger Highway New Alignment Map

Download Mokama-Munger Highway New Alignment Map PDF or high quality & high resolution image in JPG, PNG or WEBP format using the direct download links given below.

| By Pradeep Ronze

Mokama-Munger Highway New Alignment Map - File Information

Map Name Mokama-Munger Highway New Alignment Map
Available Formats WEBPPDFJPGPNG
WEBP Size0.13 MB
PDF Size0.18 MB
JPG Size0.48 MB
PNG Size2.03 MB
No. of Pages in PDF1
Image Height1327 Pixels
Image Width1638 Pixels
Category General
Related,

Mokama-Munger Highway New Alignment Map - Preview

Mokama-Munger Highway New Alignment Map Preview in Large Size
0 likes
love / feedback 0 Comments
share this map Share
report this map Report

Mokama-Munger Highway New Alignment Map - Summary

Mokama-Munger Highway Approved – Faster Travel and Big Boost for Bihar

A new 4-lane Mokama-Munger section of the Buxar-Bhagalpur High-Speed Corridor has been approved by the Cabinet Committee on Economic Affairs. This 82.4 km stretch will be built on Hybrid Annuity Mode (HAM) with an outlay of ₹4447.38 crore.

This project is very important for Bihar as it connects Mokama, Barahiya, Lakhisarai, Jamalpur, and Munger directly to Bhagalpur. The whole belt is becoming an industrial hub with a gun factory, locomotive workshop, food processing units, and textile clusters like Bhagalpuri silk. With this new highway, both passenger and goods transport will become easier and faster.

The highway will be fully access-controlled, allowing vehicles to run at an average speed of 80 km/h. Travel time between Mokama and Munger will come down to just 1.5 hours. This means safer, smoother, and quicker connectivity for everyone.

Apart from better transport, the project will generate nearly 14.83 lakh man-days of direct jobs and 18.46 lakh man-days of indirect jobs. More economic activities like food packaging, warehousing, and textile industries are also expected to grow in this region after the highway is built.

Key Highlights of Mokama-Munger Highway Project

ParticularDetails
Total Length82.4 km
ModeHybrid Annuity Mode (HAM)
Project Cost₹4447.38 crore
Major Cities ConnectedMokama, Barahiya, Lakhisarai, Jamalpur, Munger, Bhagalpur
Average Speed80 km/h
Travel TimeAround 1.5 hours
Employment Generated14.83 lakh direct man-days, 18.46 lakh indirect man-days

Mokama-Munger Highway New Alignment Map - Download Links

  • WEBP 0.13MB
  • PDF 0.18MB
  • JPG 0.48MB
  • PNG 2.03MB
Please select a file type you wish to download

Leave a Reply

Your email address will not be published. Required fields are marked *

*