Sector 32 YEIDA Final Master Map

Download Sector 32 YEIDA Final Master Map PDF or high quality & high resolution image in JPG, PNG or WEBP format using the direct download links given below.

| By Pradeep Ronze

Sector 32 YEIDA Final Master Map - File Information

Map Name Sector 32 YEIDA Final Master Map
Available Formats WEBPPDFJPGPNG
WEBP Size0.86 MB
PDF Size1.18 MB
JPG Size2.98 MB
PNG Size4.57 MB
No. of Pages in PDF1
Image Height2526 Pixels
Image Width3576 Pixels
Category Master Plans
Related,

Sector 32 YEIDA Final Master Map - Preview

Sector 32 YEIDA Final Master Map Preview in Large Size
0 likes
love / feedback 0 Comments
share this map Share
report this map Report

Sector 32 YEIDA Final Master Map - Summary

The YEIDA Sector 32 Master Plan is designed to create a well-connected, industrially robust, and commercially viable urban hub. With a focus on infrastructure, energy efficiency, and economic growth, Sector 32 is poised to become a strategic business and industrial corridor in the region.

Highlights of the Plan

  • Optimized Plot Reallocation – Several plots have been modified, merged, or reallocated based on the requirements of different departments.
  • Electric Substations (ESS) – Provision for two major substations (ESS-1 & ESS-2) to meet industrial and residential electricity needs.
  • Water Works & Utility Services – Designated facility plots for water supply infrastructure (WW-1) and other essential utilities.
  • Industrial & Commercial Spaces – Planned zones for industrial activities, business centers, and mixed-use developments.
  • Transportation & Road Network – Road realignment and optimization for better traffic flow and connectivity.

Land Use & Zoning Allocations

The layout plan of Sector 32 includes the following land use designations:

  • Industrial Plots – Reorganized for enhanced manufacturing and warehousing.
  • Commercial Areas – Business hubs, retail centers, and mixed-use developments.
  • Electric Substations – ESS-1 (12 acres) and ESS-2 (5 acres) for power supply.
  • Water Works (WW-1) – Dedicated area for water treatment and distribution.
  • Transport Infrastructure – 75m-wide roads with realigned intersections for improved connectivity.

Sector 32 YEIDA Final Master Map - Download Links

  • WEBP 0.86MB
  • PDF 1.18MB
  • JPG 2.98MB
  • PNG 4.57MB
Please select a file type you wish to download

Leave a Reply

Your email address will not be published. Required fields are marked *

*